Plan a 2 million m²/year gypsum board production line: capacity basis, process layout, machinery photos, quotation and power requirements.
Plan an initial manufacturing operation
A 2 million m²/year project should begin with a focused product schedule and a realistic sales plan. Identify the board sizes that will be produced most often, then agree how materials, paper rolls and finished stacks will move through the factory.
Configuration priorities
For this capacity option, compare the scope of manual and automated downstream handling explicitly. A lower annual target does not by itself define staffing, equipment speed or the building footprint.
Capacity basis
The annual figure is a nominal capacity option. Final output depends on board thickness, scheduled operating time, product changes and production efficiency. The daily target below is an arithmetic planning example based on 300 operating days, not a tested machine rating.
Prepare the technical scope
Define the raw-material preparation boundary, paper supply, forming, drying, finishing, stacking and packing responsibilities. Request a project-specific equipment list and utility schedule.
Technical specifications
| Parameter | Specification |
|---|---|
| Nominal annual capacity option | 2 million m²/year |
| Planning schedule | 300 operating days/year (assumption) |
| Average daily area target | 6,667 m²/day (calculated) |
| Board sizes and thickness | Project-specific; to be confirmed |
| Installed electrical power | To be confirmed; not scaled from other capacities |
| Workshop and dryer layout | Project-specific engineering required |
| Price | Quotation based on agreed scope |
Conceptual layout drawing
Production equipment photos


Frequently asked questions
What is the price of this production line?
Price is quoted for the agreed equipment scope, automation, installation support and delivery terms. No fixed price is published. Send your product specification and site information for an itemized quotation.
What is the power consumption?
Installed power and operating consumption must be confirmed in the technical offer. Ask for both the connected load in kW and estimated energy use per unit of finished product, including auxiliaries.
Is the layout drawing ready for construction?
No. The drawing is a conceptual process layout, not to scale. Foundations, clearances, utilities and equipment dimensions require a project-specific engineering drawing.
How do I request a quotation?
Send the intended product dimensions, target output, raw-material details, factory drawing and available utilities to sales@gypsumboardmachinery.com.